Revamping of the “Central District” has closed the athletic fields, as the site is currently being used as a wellfield for the drilling of two drill rigs. The athletic fields affected consist of the soccer field and throwing and jumping spaces for the Track and Field team. A comment from the Geothermal Energy Project shared that construction on these fields will take place from Nov. 12, 2024 to May 15, 2026.